SCOPE OF BUSINESS MAJOR PERFORMANCE INTERNATIONAL CO-OPERATION

CHINA ZHONGYUAN ENGINEERING

SCOPE OF BUSINESS

Nuclear Power Technology

With the complete nuclear industry chain and a series of independently developed G-Ⅲ nuclear power technologies, i.e. Hualong one (HPR1000), ACP600 and SMR (ACP100), we are able to have all-round cooperation with the globe.

Renewable Energy

Focus on the construction of renewable energy projects,featuring solar,wind,tidal and other renewable energies.

Application of Nuclear Technology

Industrial production of isotopes and its products, radiation processing products and services, and radiographic equipment.

Nuclear Fuel Cycle Service

For global users, we provide complete nuclear fuel cycle services ranging from uranium exploration to the reprocessing of spent fuel. We are also the sole Chinese nuclear fuel supplier that can produce various types of fuels for VVER, AFA3G, PHWR, CF3, HTGR, AP1000 and other types of reactors.

Nuclear Scientific Research

More than 20 national research institutes, advanced technology R&D platforms and a competent scientific research team.

Nuclear Power

R&D, design, general contracting, engineering, and operation of nuclear power reactors and provide services to world customers.

Nuclear Environmental Protection

Complete decommissioning of nuclear facilities, reprocessing and disposal of radioactive wastes, transportation system for nuclear materials, radiation protection system and emergency response system, ensuring the safe transportation of spent fuel and disposal of radioactive wastes.

Main Performances of EPC Projects
Algeria Birine Nuclear Research Center (Phase-I and Phase-II)

The center is the first large-sized nuclear facility exported by China with a turnkey mode. Phase-I includes a heavy water reactor and other associated facility, Phase-II consists of nine hot cells for post-irradiation examination on fuel elements and material. The reactor nominal capacity is 15MW and the thermal neutron flux rate is 2.4x1014n/cm2.s. It could be used for basic and application research, and also used for radioisotopes and radiopharmaceuticals production, silicon doping, fuel element and material radiation test, neutron activation analysis, cold neutron research, nuclear instrument scale, etc. Some key techniques were transferred to Algeria and local human resource was developed for reactor operation and maintenance and research work. The project was awarded the first Prize of National Science and Technology Progress, and was credited as a successful example of “south-south cooperation”.

Pakistan Chashma Nuclear Power Plant Unit-1/2/3/4

Pakistan Chashma Nuclear Power Plant Unit-1/2/3/4 witness CZEC’s rich experience of EPC and World-Class management. C1, the first nuclear power plant exported by China and a milestone of China’s nuclear power going abroad, was praised as an “excellent model” by the Pakistani government. C2, another model of Sino-Pakistan cooperation in science and technology, its provisional acceptance was 111 days ahead of schedule. At the moment, C3 and C4 are also going well; the project progress, safety, quality and cost are well controlled.

Pakistan Karachi Nuclear Power Plant II and III(K-2/3)

卡拉奇核電項目(K2、K3)是巴基斯坦國內目前最大的核電項目。卡拉奇2號核電機組是繼福建福清5號機組之后全球第二個開建的華龍一號核電項目,意味著華龍一號首次走出國門,正式落地巴基斯坦,海內外將同步推進華龍一號示范堆的建設。2015年,8月20日,卡拉奇核電項目二號機組第一罐混凝土澆筑,標志著項目正式開建。目前,已進入全面建設階段。

High Technology Research, Development and Utilization
In-Hospital Neutron Irradiator (IHNI)

Prof. Zhou Yongmao, Member of Chinese Academy of Engineering, has developed the framework design of IHNI for maligned cancer treatment by combining boron neutron capture principle with application of miniature reactor, and the original framework design of IHNI project was conferred with patent certificate by China Intellectual Property Rights Bureau. IHNI-1, the first set of In-Hospital Neutron Irradiator in the world to be operated by neurosurgeons specially designed for BNCT malignant tumor treatment, which has been awarded with the First Prize of Science and Technology by China Nuclear Energy Association, was constructed in early 2010. At present stage, Prof. Zhou Yongmao and his team are engaged in development of IHNI-1 updated products.

International Thermonuclear Experimental Reactor (ITER)

International Thermonuclear Experimental Reactor (ITER) Project is an international multi-cooperation big science project after the international space station for developing a Tokamak of self-sustaining combustion and verifying the engineering feasibility and reliability of the thermonuclear reactor. It is the largest international Science and Technology project that China participates as a competent equal partner like other members.CNNC-CZEC has participated in the ITER Program.

Domestic and overseas civil projects

We have undertaken a great number of civil projects both at home and abroad and have made outstanding achievements.

YFJD Technology Complex Building (E-01) Project in Chengdu province undertook by CZEC, is awarded the Lotus Cup for its high quality and a reputation as the civilized construction site as well.

CZEC has conducted many oversea civil projects, such as University and Residential Project in Algeria, Expressway in Malaysia, and Dike-dam in Brunei. These demonstrated our construction and management ability of civil projects.

International Cooperation & Market Development

For more than 30 years, we have consistently provided reliable, economical and high-quality products and services to our oversea customers. While dedicating ourselves to the development of nuclear power industry, we’re also willing to share our achievements and all the benefits that could be brought in to our users.

加拿大項目

2014年7月 中核集團與加拿大SNC蘭萬靈集團公司簽署合作諒解備忘錄 2014年11月 中核集團與加拿大坎杜能源公司于APEC期間簽署了關于組建合資公司的框架協議 2015年9月 中核集團公司錢智民總經理與蘭萬靈集團公司高層就雙方成立合資公司及相關戰略合作舉行會談,并簽署AFCR前期研發協議、服務合同和會議紀要。 2016年9月 錢智民總經理與蘭萬靈公司電力總裁Sandy Taylor、上海電氣核電集團李華剛副總裁簽署了《中國核工業集團公司與坎杜能源公司、上海電氣集團股份有限公司關于成立中外合資經營企業的聯合聲明》

約旦項目

2015年5月,中國核工業集團公司、約旦原子能委員會、俄羅斯原子能海外公司召開首次三方高層會議。 2015年7月,中國核工業集團公司、約旦原子能委員會、俄羅斯原子能海外公司召開第二次三方高層會議。

沙特項目

2012年1月,中沙兩國簽署了政府間和平利用核能協定 2013年11月,中核集團與沙特國王科技城(KACST)簽署了《關于沙特核能開發項目合作的諒解備忘錄》 2013年12月,國家能源局與沙特核能城(K.A.CARE)簽署了《加強和平利用核能合作的諒解備忘錄》 2014年2月,中核集團與沙特科技發展與投資公司(TAQNIA)簽署了《關于沙特核能與可再生能源項目第一次指導委員會會議紀要》 2014年8月,中核集團與K.A.CARE簽署了《關于在和平利用核能領域項目合作協調機制的諒解備忘錄》 2014年11月,中核集團與TAQNIA簽署了《關于沙特核能與可再生能源項目第二次指導委員會會議紀要》 2016年8月,中核集團與K.A.CARE簽署了《關于核技術人力資源建設的諒解備忘錄》

巴基斯坦項目

恰希瑪4臺核電機組建設歷程 2000年9月,1號機組投入商運。 2011年5月,2號機組投入商運。 2011年3月,3號機組第一罐混凝土澆灌成功。 2013年3月,3號機組穹頂吊裝成功。 2016年5月,3號機組首次裝料成功。 2016年10月,3號機組首次臨界。 2016年10月,3號機組正式并網成功 2011年12月,4號機組第一罐混凝土澆灌成功。 2016年5月,4號機組進入全面調試階段。 卡拉奇2臺核電機組建設歷程 2013年2月,中核集團與巴基斯坦原委會于簽訂了卡拉奇2、3號核電項目華龍一號出口合同。 2015年8月,2號機組實現核島澆筑第一罐混凝土

巴西項目

2015年5月,中核集團與巴西國家電力公司、巴西核電公司簽署了《核能領域合作諒解備忘錄》; 2015年5月,參展《中國大型裝備制造業展會》 2016年9月,中原公司組織代表團與巴西電力公司簽署會議紀要,與巴西電力公司、巴西核電公司簽署聯合聲明

阿根廷壓水堆

2015年2月 國家能源局與阿根廷計劃部簽署了《關于在阿根廷合作建設壓水堆核電站的協議》,雙方同意采用中核集團“華龍一號”技術 2015年11月 CNNC與NASA簽署了《阿根廷壓水堆項目框架合同》 2016年6月 阿根廷能礦部部長與國家能源局局長簽署《關于合作建設阿根廷核電站的諒解備忘錄》 2016年9月 G20期間,CNNC總經理錢智民拜會了阿根廷總統馬克里,馬克里總統表示將積極支持、推動雙方核電合作,實現壓水堆項目2019年開工建設

阿根廷重水堆

2014年7月,國家能源局與阿根廷計劃部簽署了《中華人民共和國政府和阿根廷共和國政府關于在阿根廷合作建設重水堆核電站的協議》;中核集團、中國工商銀行與阿根廷核電公司(NASA)簽署了《關于建設阿根廷重水堆核電項目的實施協議》; 2014年9月,中核集團與NASA簽署了《阿根廷重水堆核電站框架合同》; 2015年2月,國家能源局與阿根廷計劃部簽署了《關于合作在阿根廷建設重水堆核電站的諒解備忘錄》; 2015年11月,中國工商銀行與阿根廷經濟部簽署了《關于阿根廷重水堆核電站的融資條款清單》; 2016年6月,國家能源局努爾?白克力與阿根廷能礦部部長阿朗古倫舉行簽署了《關于合作建設阿根廷核電站的諒解備忘錄》; 2016年9月,G20杭州峰會期間集團公司總經理錢智民拜會阿根廷總統馬克里,馬克里總統表示將積極支持、推動雙方核電合作,實現重水堆項目2017年開工建設、壓水堆項目2019年開工建設。

阿爾及利亞項目

1983年2月,中華人民共和國核工業部與阿爾及利亞民主人民共和國新能源署在北京簽署關于和平合作利用核能合作議定書。 1987年,中核集團中國中原對外有限公司為阿爾及利亞設計建造以15MW重水研究堆(ES-Salem反應堆)為核心的比林核研究中心。 1993年,比林核研究中心一期工程(重水研究堆及輔助設施)完成最終驗收。并于當年國際原子能機構年會上,重水研究堆出口工程項目被IAEA譽為“南南合作的典范”。 1991年至1996年,中原公司為阿方設計建造比林核研究中心二期工程。1996年,中國援助阿爾及利亞的和平堆(MHWRR)獲國家科技進步一等獎。 2008年3月,中阿雙方重新簽署了“中阿兩國政府關于和平利用核能合作協議”及“中阿兩國關于和平利用核能合作伙伴協議”。 2014年12月,中原公司與比林核研究中心正式簽署了比林核研究中心一二期升級改造項目合同。 2015年4月,中核集團與阿爾及利亞原子能署簽署了《中國核工業集團公司與阿爾及利亞原子能署核能全面戰略合作協議》。該協議旨在推動雙方在核電、研究堆、核安全、核技術、核燃料、核安保、海水淡化等領域的務實合作。 2016年9月, 國家能源局局長努爾.白克力與阿爾及利亞能源部部長Noureddine Boutarfa進行會談,雙方就進一步深化中阿核能合作進行了深入的交流。

蘇丹項目

2013年7月,中核集團與蘇丹水資源與電力部簽署了《CNNC與WRE關于核電合作協調機制諒解備忘錄》和第一次高層協調會議紀要 2013年7月,中核集團與蘇丹水資源與電力部簽署了《蘇丹第一座核電廠址選擇框架協議》和《蘇丹核電人力資源框架協議》 2013年11月,國家能源局局長吳新雄與蘇丹水資源與電力部副部長Musa共同簽署了中蘇兩國“政府間和平利用核能協議” 2013年11月,中原公司與蘇丹水資源與電力部簽署了《蘇丹核電人力資源培訓合同》 2016年5月,孫勤董事長代表中核集團與蘇丹水電部部長穆塔茲簽署了《廠址初可研和可研技術服務框架協議》和《人力資源開發服務框架協議》

埃及項目

2002年1月,中埃兩國政府簽署了《和平利用核能協議》 2014年12月, MOEE與中核集團簽署《太陽能領域合作諒解備忘錄》。 2014年12月,埃及總統塞西訪華期間發表了《中華人民共和國和阿拉伯埃及共和國關于建立全面戰略伙伴關系的聯合聲明》,明確了兩國加強和平利用核能領域的合作。 2015年5月,中核集團與埃及電力及可再生能源部簽署了《中核集團與埃及核電管理局核能合作諒解備忘錄》。 2015年7月,中核集團向埃及電力及可再生能源部提交了商務、融資和技術建議書。 2016年1月,習主席訪問埃及,全方位推進中埃全面戰略伙伴關系深入發展,期間習主席在埃及總理謝里夫·伊斯梅爾的陪同下參加了我國在埃及首都開羅舉辦的中國高科技展,親切詢問了中核集團的業務情況,并向伊斯梅爾總理介紹華龍一號。 2016年8月,中核集團向埃及電力及可再生能源部提交了進一步融資建議書和商務報價函。 2016年10月,中核集團編制技術轉讓、本地化和燃料供應與廠建建議書,以及人力資源發展方案。

哈薩克斯坦項目

2010年6月,中哈兩國政府簽署《中華人民共和國政府與哈薩克斯坦共和國政府和平利用核能合作協定》。2011年4月20日,該協定正式生效。 2011年6月,中核集團與哈原子能工業公司簽署核能領域戰略合作協議。 2013年12月,中核集團代表團與哈薩克斯坦國家原子能公司簽署了《中國核工業集團公司與哈薩克斯坦原子能工業公司關于落實核能領域戰略合作協議共同行動的議定書》。